Posted by the employer · Riverside, United States
Traveling Data Center Construction Superintendent
ARCO Companies · Riverside · United States
Posted: 8/24/2026 · On the employer's job feed since 10/11/2026
The advert
Quoted in full from ARCO Companies's job posting. Gavroche does not edit it.
About You:
Ready to experience a better way to build your career? ARCO National Construction is seeking a Traveling Construction Superintendent to lead data center and mission critical design-build projects across the United States.
This is a role for an experienced Superintendent, Lead Superintendent, Senior Superintendent, or similar construction professional who is ready to take ownership of jobsite execution from post-award review through project completion. You will lead subcontractors, maintain project schedules, enforce safety and quality standards, and partner closely with the project manager to deliver successful projects for our clients.
At ARCO, you will receive the tools, support, and responsibility to excel from day one while working alongside a team committed to superior solutions, client service, and an award-winning workplace culture.
A Day in the Life:
- Lead the execution of large-scale, mission-critical data center projects from preconstruction through punch list
- Demonstrate strong leadership with ability and willingness to face challenges, direct subcontractors, and effectively resolve conflicts
- Partner with the project team to support the construction schedule, including activity sequencing, manpower, and equipment needs
- Ensure work meets specifications, stays on schedule, and achieves target profitability
- Assist in the preparation of job progress and cost reports to accurately reflect actual costs
- Review and approve requisitions, field purchase orders, invoices, and key project documents
- Maintain constant communication with the project team to keep them informed of job progress, plans, and issues that may impact costs or schedules
- Complete daily reports documenting key project details, events, conditions, visitors, client interactions, commitments, and approvals
- Enforce adherence to the company’s safety program in all phases of the project
- Lead with integrity and a commitment to quality, upholding company values and focusing on exceeding internal and external client expectations
Necessary Qualifications:
- 5-25 years of experience as a Lead Superintendent, with at least 5 years in data center construction or mission critical projects
- Willingness and ability to travel throughout the United States.
- Proficiency in construction management software (e.g. Procore, Bluebeam, Excel)
-
Possess and maintain a current, valid driver's license in your state of residence
- Ability to meet the physical demands of the job, including but not limited to: standing or walking for long periods of time, occasionally on uneven terrain, bending, kneeling, crouching, climbing stairs, and/or lifting heavy loads of up to 50 pounds.
What We Can Offer You:
At ARCO, we are committed to taking care of our greatest asset – our team. ARCO’s best-in-class benefits and superior compensation are what set us apart from the competition and continue to attract top industry talent.
- Vehicle allowance, per diem, and living expenses on traveling jobs
- Plane ticket home every 2 weeks when traveling
- Industry-leading performance-based bonus program
- 100% employer-funded ESOP to all associates
- Traditional and Roth 401k
- 1-month paid sabbatical after every five years of employment, plus $5,000 for travel
- 3 weeks of vacation
- 1-week paid volunteer leave each year and 100% charitable match
- Medical, dental, and vision insurance coverage
- 100% paid 12-week maternity leave
- Scholarship for associates’ children up to $28,000 per child
- Tuition reimbursement for associates
#LI-CR1 #LI-Onsite
MAKE YOUR MOVE
We are proud to be one of the fastest-growing, privately-owned companies in America, celebrating over 30 years of experience as design-build experts. We have completed over 7,500 design-build projects nationwide. We ranked #9 on ENR’s Design-Build Firms list and #34 on ENR's Top 400 Contractors list of 2026. Most importantly, our clients like us, trust us, and want to do business with us. We are looking for people with the same enthusiasm, passion, and respect for the hard work that brought us to where we are today. Are you a person who can make a difference at ARCO? If the answer is “Yes!” we look forward to meeting you.
ARCO does not accept unsolicited resumes from individual recruiters or third-party recruiting agencies without pre-approval from ARCO’s Human Resources team. Pre-approval is required before any external candidate can be submitted. ARCO will not be responsible for fees related to unsolicited resumes and for candidates who are sent directly to our hiring managers. Agencies must have a fully executed vendor agreement in place as well as written approval to submit candidates from an ARCO TA Manager for a specific position before submitting candidates.
LEGAL DISCLAIMER
EOE, including disability/vets
Similar roles in Riverside
- Traveling Data Center Construction Superintendent · ARCO National Holdings, Riverside
- Licensed Civil Engineer - Site Design · Olsson, Omaha
- Licensed Civil Engineer - Site Design · Olsson, Des Moines
- Licensed Civil Engineer - Site Design/Municipal · Olsson, Norfolk
- Construction Superintendent - Power Generation · SpaceXAI, Southaven
- Construction Manager - Power Generation · SpaceXAI, Southaven
200 open civil / construction engineer roles found; at most three per employer shown. Source: Direct employer job feeds (ATS) and career sites crawled by gavroche-direct.
How civil / construction engineer roles in United States are worked
1% fully remote · 0% hybrid · 99% on-site
From 166 adverts whose ATS states a work mode. Source: Direct employer job feeds (ATS) and career sites crawled by gavroche-direct; the employers' own work-mode flags (adverts without one count as on-site).
Other roles at ARCO Companies
- Project Developer - Renovations & Interiors · Chicago
- Project Developer - Energy & Infrastructure · Chicago
- Technology Product Manager - Financial Applications · Brentwood
- Instructional Designer · Atlanta
- Superintendent - Commercial Construction · Dallas
- Traveling Superintendent - Commercial Construction · Orlando
427 open. Source: Direct employer job feeds (ATS) and career sites crawled by gavroche-direct.