← Back to results

Los Angeles, United States

Senior Construction Scheduler

CLMI Group, LLC · Los Angeles · United States

Contract
Full time

Posted: 6/3/2026 · Last checked: 11/27/2026

Job description

Quoted in full from CLMI Group, LLC's job posting. Gavroche does not edit it.

CLMI Group is looking for passionate construction professionals to join our team! We value ambition, dedication, and innovation, and believe in building a network of talented individuals who share our commitment to making a difference.

Position Title: Senior Regional Construction Scheduler

Location: Los Angeles Unified School District

Due Date: Continuous until positions are filled 

Duties:

  • Reporting directly to the Sr Construction Manager for Scheduling and Estimating and provides updates and prepares reports for upper management in order to meet Key Performance Indicators.
  • Supervise Project Schedulers to ensure project timelines are met and interfaces with OARs, Senior Project Managers and other site staff and contractors related to the review of CPM schedules, preparation of project scope and budget.
  • Projects staffing needs and makes recommendations to executive staff to improve staff requirements.
  • Develops and maintains program schedules identifying relationships, logic, milestones, and constraints for construction projects of various types.
  • Independently interprets and reads detailed construction drawings (Architectural, Structural, Mechanical, Electrical, Plumbing, Civil, etc.) and develops a clear understanding of work scope.
  • Reviews Contractor’s Baseline schedule submissions and verifies that all work scope is identified properly and logically sequenced correctly; provides written detailed schedule review comments.
  • Performs QA/QC on contractor schedule submittals for conformance with contract terms; reviews critical path, cost loading, resource loading of man-hours, schedule content, recovery schedules, use of logic relationships and lags, constraints and milestones.
  • Performs schedule Time Impact Analysis for any change orders that affect the construction schedule; conducts schedule negotiations with the OAR and the contractor for any delay time settlements.
  • Reads drawings to determine if work is in or out of scope, and understands terms and conditions of the contract to determine if any compensable or non-compensable time extensions have merit.
  • Performs Critical Path analysis and Earned Value analysis.
  • Walks the construction sites as needed and checks the contractor’s weekly/monthly schedule progress; provides reports to the project OAR and upper management.
  • Effectively communicates with the Contractor regarding all schedule/progress related matters and concerns in the weekly status meetings and all other schedule related meetings.
  • Performs Program Schedule QA/QC reviews on a regular basis.
  • Performs status updates for Program Schedules/Master Schedules on a bi-monthly basis.
  • Prepares reports as needed and directed by Management.

Requirements

Minimum Requirements:

Required Experience:

  • Minimum eight (8) years full time paid professional experience in Construction Scheduling for an Owner or General Contractor, preferably in an educational facility or public works projects.
  • Proficiency in Primavera Latest Version and MS Office Suite

Required Education: 

  • Graduation from a recognized college or university with a bachelor’s degree in architecture, engineering or construction management.

OR

  • Graduation from a recognized college or university with a bachelor’s degree in any course, but with additional two (2) years of experience in the duties above to compensate for the required education.

Required Skills:

  • Excellent written and verbal communication skills
  • Superior organizational and planning skills
  • Ability to build efficient working relationships with project teams and department staff
  • Understanding of theories, principles and practices of cost engineering, scheduling and schedule forensics

Offered rate of compensation will be based on a variety of non-discriminatory factors, including education, qualifications, experience, and geographic location.

Benefits

  • Health Care Plan (Medical, Dental & Vision)
  • Retirement Plan (401k)
  • 401k Matching
  • Paid Time Off (Vacation, Sick & Public Holidays)
  • Short Term / Long Term Disability / Life

From Gavroche data

Figures computed from live adverts on Gavroche; the job text above is the employer's.

New openings in Los Angeles, by week

  1. 8/31/2026 151
  2. 9/7/2026 127
  3. 9/14/2026 160
  4. 9/21/2026 158
  5. 9/28/2026 190
  6. 10/5/2026 211
  7. 10/12/2026 223
  8. 10/19/2026 203
  9. 10/26/2026 231
  10. 11/2/2026 257
  11. 11/9/2026 197
  12. 11/16/2026 265
  13. 11/23/2026 109

2,482 openings over 12 weeks, by the week they were published.

Other roles at CLMI Group, LLC

18 open.